Guiding Renewable Interconnection and Distribution (GRID) Amendment Act of 2026
Latest Action: March 3, 2026
Everything you need to know about plug-in balcony solar in District of Columbia: legal status, tracked bills, statutory wattage limits, utility interconnection rules, and expected monthly solar production.
Current Disposition: Balcony solar bill pending
District of Columbia Council Bill B26-0602, the Guiding Renewable Interconnection and Distribution (GRID) Amendment Act of 2026, was introduced on February 24, 2026 by Councilmember Allen with six co-introducers, and referred to the Committee on Transportation and the Environment, which held a hearing on March 26, 2026. The bill would exempt portable solar generation devices from utility interconnection and net metering requirements; the introduced text sets no watt limit. In the absence of enactment, small solar systems remain governed by DC PSC Title 15 DCMR Chapter 40 rules and Pepco Small Generator Interconnection Procedures.
Latest Action: March 3, 2026
How much electricity will a standard plug-in solar kit produce on a balcony or patio in District of Columbia? Below are monthly estimates based on local insolation levels:
| Month | Daily Peak Sun Hours | 400W Kit (1 Panel) | 800W Kit (2 Panels) |
|---|---|---|---|
| Jan | 3.6 hrs | 38 kWh | 77 kWh |
| Feb | 4.2 hrs | 40 kWh | 81 kWh |
| Mar | 4.9 hrs | 52 kWh | 105 kWh |
| Apr | 5.3 hrs | 55 kWh | 109 kWh |
| May | 5.4 hrs | 58 kWh | 115 kWh |
| Jun | 5.6 hrs | 58 kWh | 116 kWh |
| Jul | 5.5 hrs | 59 kWh | 117 kWh |
| Aug | 5.5 hrs | 59 kWh | 117 kWh |
| Sep | 5.2 hrs | 54 kWh | 107 kWh |
| Oct | 4.7 hrs | 50 kWh | 100 kWh |
| Nov | 3.8 hrs | 39 kWh | 78 kWh |
| Dec | 3.1 hrs | 33 kWh | 66 kWh |
| Annual Total | -- | ~595 kWh | ~1188 kWh |
Estimates derived from historical National Renewable Energy Laboratory (NREL NSRDB) solar radiation averages across weather stations in District of Columbia, modeling an 86% system performance ratio.
Customize system orientation, local utility electric rates, and shade factors with our interactive simulator.
Open Solar Savings Simulator for District of Columbia →While balcony solar kits are designed for plug-in operation, municipal permitting processes indicate solar-friendly administrative environments:
Notwithstanding any other provision of law, a portable solar generation device shall not be subject to interconnection or net metering requirements unless the owner of a portable solar generation device chooses to voluntarily enter into an interconnection or net metering agreement.
B26-0602, Sec 2 (new Sec 206a(e)(1)), p. 12
The Electric Company may not require a customer using a portable solar generation device to: Obtain approval before installing or using the system; Pay any fee or charge related to the system; or Install any additional controls or equipment beyond what is integrated into the system.
B26-0602, Sec 2 (new Sec 206a(e)(2)), p. 12
The Electric Company is not liable for any damage or injury caused by a portable solar generation device.
B26-0602, Sec 2 (new Sec 206a(e)(3)), p. 12
In order to ensure safe operation and reduce impacts on the grid, portable solar generation devices must: Meet the most recent version of the National Electrical Code and be certified by Underwriters Laboratories or an equivalent nationally recognized testing laboratory; Include a device or feature that prevents the system from energizing the building's electrical system during a power outage.