Balcony Solar in Delaware

Balcony solar bill failed Verified as of September 25, 2026

Everything you need to know about plug-in balcony solar in Delaware: legal status, tracked bills, statutory wattage limits, utility interconnection rules, and expected monthly solar production.

Legislation Summary

Status
Balcony solar bill failed
Wattage allowed
Not yet verified
Wattage tiers
Not yet verified
HOA / Condo Protections
Not yet verified
Plug-in Battery Storage
Not yet verified
Renters & Tenant Rights
Not yet verified
Permit & Electrician DIY Status
Not yet verified
Utility Interconnection
Not yet verified
Bill
SB 270 - An Act to Amend Title 26 of the Delaware Code Relating to Portable Solar Generation Devices
Date passed
Not yet verified
Date effective
Not yet verified

Legal Status: Can You Plug In Solar in Delaware?

Tracked Legislation in Delaware

SB 270 senate Tracked

An Act to Amend Title 26 of the Delaware Code Relating to Portable Solar Generation Devices

Latest Action: March 26, 2026

Estimated Solar Energy Production in Delaware

How much electricity will a standard plug-in solar kit produce on a balcony or patio in Delaware? Below are monthly estimates based on local insolation levels:

Standard 400W Kit ~584 kWh Estimated annual electricity production
Dual-Panel 800W Kit ~1165 kWh Estimated annual electricity production
Month Daily Peak Sun Hours 400W Kit (1 Panel) 800W Kit (2 Panels)
Jan 3.4 hrs 36 kWh 73 kWh
Feb 4.2 hrs 40 kWh 81 kWh
Mar 4.8 hrs 51 kWh 102 kWh
Apr 5.2 hrs 54 kWh 107 kWh
May 5.3 hrs 57 kWh 113 kWh
Jun 5.6 hrs 58 kWh 116 kWh
Jul 5.6 hrs 60 kWh 119 kWh
Aug 5.5 hrs 59 kWh 117 kWh
Sep 5.1 hrs 53 kWh 105 kWh
Oct 4.5 hrs 48 kWh 96 kWh
Nov 3.5 hrs 36 kWh 72 kWh
Dec 3.0 hrs 32 kWh 64 kWh
Annual Total -- ~584 kWh ~1165 kWh

Estimates derived from historical National Renewable Energy Laboratory (NREL NSRDB) solar radiation averages across weather stations in Delaware, modeling an 86% system performance ratio.

Calculate Your Exact Bill Savings

Customize system orientation, local utility electric rates, and shade factors with our interactive simulator.

Open Solar Savings Simulator for Delaware →

Incentives, Solar Rights & Grid Barriers

State Incentives & Solar Rights

No specific state-wide financial incentives currently filed for plug-in solar.

Utility Barriers & Interconnection Rules

  • Interconnection agreement required
  • NEC-compliant installation required

Official Delaware Energy Resources

Legislative depth

Definition of portable solar generation device

Moveable photovoltaic generation device with a total maximum power output per utility meter of not more than 800 watts; connects through a standard 120-volt AC outlet; intended to offset part of consumption; meets current NEC as adopted by the Office of the State Fire Marshal; certified by UL or equivalent.

26 Del. C. Sec. 1022(a)(2)

Exemption from interconnection unless net metering; UL 1741 anti-islanding

Meeting device is exempt from interconnection requirements, interconnection agreements and net-metering program requirements unless the customer intends to engage in net metering; device must include UL 1741 (or successor) anti-islanding and be installed per the latest revision of IEEE 1547.

26 Del. C. Sec. 1022(b)(1)-(2)

Utility duties, registration system and liability

Utility may not require prior approval, fees (except net-metering interconnection charges) or extra controls; not liable for damage/injury; must establish an online registration system by 2027-01-15 and must prevent registered customers from being charged for excess generation.

26 Del. C. Sec. 1022(b)(3)

DESEU safety study

The Delaware Sustainable Energy Utility must study the safety of portable solar generation devices and report findings and recommendations by 2027-01-01.

SB 270, Sec. 2