Electricity: portable solar generation devices
Latest Action: August 31, 2026
Everything you need to know about plug-in balcony solar in California: legal status, tracked bills, statutory wattage limits, utility interconnection rules, and expected monthly solar production.
Current Disposition: Balcony solar bill pending
SB 868 (Electricity: portable solar generation devices), which its author calls the Plug and Play Solar Act, would exempt qualifying portable solar generation devices with a maximum aggregated AC output of no more than 1,200 watts per dwelling from interconnection requirements, and bar utility approval and fees. The exemption would expire on January 1, 2030. The Senate passed the bill on May 19, 2026 and the Assembly on August 25, and the Senate concurred on August 26. It was presented to the Governor on August 31, 2026 and is not yet law.
Latest Action: August 31, 2026
How much electricity will a standard plug-in solar kit produce on a balcony or patio in California? Below are monthly estimates based on local insolation levels:
| Month | Daily Peak Sun Hours | 400W Kit (1 Panel) | 800W Kit (2 Panels) |
|---|---|---|---|
| Jan | 3.9 hrs | 42 kWh | 83 kWh |
| Feb | 4.7 hrs | 45 kWh | 91 kWh |
| Mar | 5.6 hrs | 60 kWh | 119 kWh |
| Apr | 6.4 hrs | 66 kWh | 132 kWh |
| May | 6.5 hrs | 69 kWh | 139 kWh |
| Jun | 6.5 hrs | 67 kWh | 134 kWh |
| Jul | 6.8 hrs | 73 kWh | 145 kWh |
| Aug | 6.7 hrs | 71 kWh | 143 kWh |
| Sep | 6.4 hrs | 66 kWh | 132 kWh |
| Oct | 5.6 hrs | 60 kWh | 119 kWh |
| Nov | 4.4 hrs | 45 kWh | 91 kWh |
| Dec | 3.8 hrs | 41 kWh | 81 kWh |
| Annual Total | -- | ~705 kWh | ~1409 kWh |
Estimates derived from historical National Renewable Energy Laboratory (NREL NSRDB) solar radiation averages across weather stations in California, modeling an 86% system performance ratio.
Customize system orientation, local utility electric rates, and shade factors with our interactive simulator.
Open Solar Savings Simulator for California →While balcony solar kits are designed for plug-in operation, municipal permitting processes indicate solar-friendly administrative environments: